EasyManua.ls Logo

ABB OmniCore C30 - Page 462

ABB OmniCore C30
606 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removing the process connectors
Note/IllustrationAction
Push the cables out from the clips in the
bottom of the controller carefully.
Note
Make records about the sequence that
cables are removed. The cables need to
be installed in the same position.
1
xx1800000738
Remove the attachment screws on the
front panel.
2
Push the process connectors into the
cabinet.
3
Push the cables on process connectors
out from the clips on the bottom of the
cabinet.
4
Take the process connectors out from
the upper side.
5
Refitting the process connectors
Refitting the process connectors
Note/IllustrationAction
DANGER
Before doing any work inside the cabinet,
disconnect the mains power. For more
information, see Electrical safety on
page 31.
1
Continues on next page
462 Product manual - OmniCore C30
3HAC060860-001 Revision: P
© Copyright 2019-2022 ABB. All rights reserved.
5 Repair
5.3.5 Replacing the process connectors
Continued

Table of Contents

Related product manuals