EasyManua.ls Logo

ABB OmniCore V250XT Type B - Initial Test before Commissioning

ABB OmniCore V250XT Type B
468 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.9 Initial test before commissioning
Protective earth
Before supplying power to the robot and commissioning, verify that the cabinet is
connected to protective earth according to Connecting incoming mains and
protective earth to the controller on page 84.
Function tests
Before commissioning, perform the function tests in section Function tests on
page 173 to verify that the safety features work properly.
160 Product manual - OmniCore V250XT Type B
3HAC087112-001 Revision: A
© Copyright 2023-2023 ABB. All rights reserved.
3 Installation and commissioning
3.9 Initial test before commissioning

Table of Contents

Related product manuals