EasyManua.ls Logo

ABB OmniCore V250XT Type B - Page 221

ABB OmniCore V250XT Type B
468 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Note/IllustrationAction
xx2300000753
Disconnect the free ends of the 24V ad-
apter harness:
Wire K7-W201 from the 24V (V+)
connection on the Connected
Services gateway.
Wire K7-W202 from the 0V (V-)
connection on the Connected
Services gateway.
2
Note
Press down the white button with a sharp
object while pulling out the wire.
Carefully lift the Connected Services
gateway slightly and then pull it out from
the bracket.
3
Refitting the Connected Services gateway
Refitting the Connected Services gateway
Note/IllustrationAction
DANGER
Before doing any work inside the cabinet,
disconnect the mains power. For more
information, see Electrical safety on
page 29.
1
Continues on next page
Product manual - OmniCore V250XT Type B 221
3HAC087112-001 Revision: A
© Copyright 2023-2023 ABB. All rights reserved.
5 Repair
5.2.5 Replacing the 4G Connected Services gateway
Continued

Table of Contents

Related product manuals