EasyManua.ls Logo

Activant Dimensions - Page 54

Default Icon
490 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2. System Training
5 Make the entries in the batch according to normal procedures for the specified
task (refer to the corresponding user manual). Each entry is assigned a sequence
number automatically as it is entered. The sequence numbers, then, are in
chronological order.
6 Print an edit list and check it carefully. The report includes the sequence number
for each entry.
7 If needed, edit the batch to correct any errors. Use normal procedures.
8 Print the edit list again. Check carefully.
9 Update the batch according to normal procedures for the task. The update will
make journal entries into the General Ledger.
10 Print the G/L Entries report (GPOST).
11 Print any other reports on the menu and file together.
46 Dimensions 14

Table of Contents