EasyManua.ls Logo

Altendorf F45 ProDrive - Page 74

Altendorf F45 ProDrive
207 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Transport, siting and installation
74
Transport, siting and installation
0000010038-003- GB
i
Note!
Observe the following:
Make sure that the extraction system is switched on together with the
machine. For this, you can use the existing potential-free contact
(POT - refer to circuit diagram) or a current transformer installed in
the supply line.
When using spray device (SPRAY), make sure that you use a suita-
ble moisture extraction system in order to avoid faults.
Check the function of the extraction system at regular intervals!
A spark-extinguishing system should be installed as a precaution to
prevent fires and explosions in filter systems, silos and other produc-
tion environments.
Ensure that the extraction system is suitable for extracting aluminium
chips!
Always collect wood, aluminium and plastic chips separately!
Prior to cutting aluminium, thoroughly clean the machine and remove
all remaining dust and chips!

Table of Contents

Related product manuals