1MANUL963 Belanger, Inc. * PO BOX 5470. * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 1-7
Chapter 1 Introduction
Scope of This Manual
This Introduction Section is intended to:
• Address the installation portion only.
• Help you to understand how the installation manual is organized.
• Encourage planning and organization.
• Address safety issues.
Installation Manual
This is the manual that covers the installation and initial startup of a Cube® system. In this
manual there is very little content as to the operation, maintenance, troubleshooting and
replacement parts of the Cube® system. For those items please refer to the Cube®
Maintenance manual and any other supplied support documents.
How the Manual is Organized
The installation manual starts off with a "punch list" of activities that must be performed during
the installation phase. The list is fairly comprehensive and provides a general order in which
the tasks should be completed to minimize installation time.
This list also acts as a directory for the remainder of the manual. Now is a good time to review
the Recommended Installation Sequence checklist in chapter 2.
The last section of the installation manual is concerned with initial startup. A checklist format
is provided as a walk- through of starting up and fine tuning the Cube® system.
Planning and Organization
The installation manual assumes that your Belanger® Representative has already visited the
site, taken measurements, and quite possibly sent drawings showing equipment locations.
The installation manual also assumes that all these items have been thoroughly reviewed by
the site General Contractor and Owner. If that is not the case, now is the time to do so. For
your convenience, the "Getting Started" section reiterates some of the critical points of a
Cube® installation. Primarily, the “Getting Started” section addresses equipment placement
and electrical considerations to ensure the Cube® system is installed successfully. If there
is a planning question not covered in this manual, please contact your Belanger®
Representative immediately.
Ensure a Safe Work Environment
The job site can be a hectic place. Often deadlines control the pace. Please keep, Job Site
Safety, in mind at all times. Proper use of all safety gear (safety glasses, hard-hats, footwear,
shields, guards, etc.) is imperative. Be aware of electrical concerns (exposed conductors,
extension cords, proximity to water, power tool maintenance, etc.). Be sure to obey OSHA
Lockout/Tagout procedures (Refer to 29 CFR 1910.147 and the example in 29 CFR
1910.147 Appendix A) and that everyone on site understands this process. Rigging (forklift
operation) is another concern. Minimize slip, trip, and fall potentials consistently. In short, be
aware of OSHA considerations, in addition to rules and regulations put in place by your local
authorities.
It is imperative to your safety and the safety of others to always follow safe
work procedures.