EasyManua.ls Logo

Belanger CUBE - Review All Bay and Equipment Room I;O; Configure Applications & Wash Packages to Match Menu Sign and Business Plan; Run Test Vehicles

Default Icon
288 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Cube
®
Installation & Startup
1MANUL963 Belanger, Inc. * PO BOX 5470. * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 19-49
Chapter 19 Initial Startup Procedure of Cub
7) Review All Bay and Equipment Room I/O
8) Configure Applications & Wash Packages to Match Menu Sign and Business
Plan
9) Run Test Vehicles
9a) Confirm applications from advanced configuration are correct.
9b) Confirm Wash Packages are proper.
9c) Adjust speeds and fill times as desired.
9d) Adjust the proper wheel penetration for the Side Wheels and Top Wheel.
9e) Check to make sure the proper entrance and exit functions occur for each wash
package and that they operate properly.
Note: It is recommended to reduce the torque setting for wheel penetration on the Side Wheels and
Top Wheel once the ShineMitts® cleaning material has had a chance to break in.

Table of Contents

Other manuals for Belanger CUBE