Chapter 3 Trades
Plumbing Coordination Meeting
Do a walk-thru with the Plumber, pointing out equipment requirements & site
specifications
Make sure the Plumber is familiar with our terminology
Provide the Plumber with the Schematic
Make this manual available to the Plumber
Thoroughly discuss site-specific requirements
Thoroughly discuss installation material selections (hoses, stainless tubing,
rigid pipe, etc.)
Discuss who is responsible for field supplied materials, such as high-pressure
hose assemblies
Discuss who is responsible for final terminations.
Penetrating the Wall for Cube® Utilities
This is where the electrical and plumbing utilities can be routed from the equipment room to the
Utility Manifold Block. Typically, the wall should be penetrated with rigid components.
It is critical that this task is performed correctly! There can be NO rubbing or chafing
in this area. The movement of the CAT Track is such that, unless done properly, there
is a good chance the utility lines will pre-maturely wear or fail in this area if they are
not secured and protected properly.