Plumbing Coordination Meeting
• Do a walk-thru with the Plumber, pointing out equipment requirements & site
specifications
• Make sure the Plumber is familiar with our terminology
• Provide the Plumber with the Schematic
• Make this manual available to the Plumber
• Thoroughly discuss site-specific requirements
• Thoroughly discuss installation material selections (hoses, stainless tubing,
rigid pipe, etc.)
• Discuss who is responsible for field supplied materials, such as high-pressure
hose assemblies
• Discuss who is responsible for final terminations.
Penetrating the Wall for Cube® Utilities
This is where the electrical and plumbing utilities can be routed from the equipment room to the
Utility Manifold Block. Typically, the wall should be penetrated with rigid components.
It is critical that this task is performed correctly! There can be NO rubbing or chafing
in this area. The movement of the CAT Track is such that, unless done properly, there
is a good chance the utility lines will pre-maturely wear or fail in this area if they are
not secured and protected properly.