Chapter 15 Water Softener Option
Component Functionality (Scanned)
Brine Tank
• A brine make-up tank is included with a standard system.
These tanks will accommodate loading of softener grade salt
and provide water to dissolve brine into a saturated liquid
form.
• Softened water is delivered to the brine tank by the control
valve during the normal regeneration sequence.
• Brine tanks include an overflow connection to allow for a
safety in case of tank overflow.
• The brine valve is also included with the brine tank. The brine
valve is used to adjust the volume of brine to be produced for
each cycle.
• For a multiple system installation, one standard brine tank is
required for each control valve.
Central Brine System
• For larger, multiple systems, a Central Brining
System alternative is available. This will replace
the need for multiple brine tanks when installing
multiple units in parallel.
• The Central Brining System has features similar to
the independent brine tanks; however, to
accommodate multiple systems, the brine refill is
accomplished by a float mechanism attached to
the softened water supply outlet of the system.
• A check valve must be added to each softener on
the brine line for the unit to operate properly with
the Central Brining System. Depending on the CP
unit selected, the Venturi Throat and Brine Flow
Control may need to be changed.