3.6.4 Load takeover
3.7 Flowcharts
3.7.1 Flowcharts
Using flowcharts, the principles of the most important functions will be illustrated in the next sections. The
functions included are:
● Mode shift
● MB open sequence
● GB open sequence
● Stop sequence
● Start sequence
● MB close sequence
● GB close sequence
● Load takeover
● Island operation
● Automatic Mains Failure
● Test sequence
The flowcharts on the following pages are for guidance only. For illustrative purposes, the
flowcharts are simplified in some extent.
AGC 100 Designer's Reference Handbook
4189340766 UK
Functional descriptions
DEIF A/S Page 19 of 152