EasyManua.ls Logo

Dell EMC ML3 - Connecting cables

Dell EMC ML3
202 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Validating tape drive installation
Tape drives come already installed in the library modules.
v Half-height tape drives can be installed in any drive bay in a module.
v Full-height tape drives must be installed in the lowest two bays of a module. Installing a full-height
drive in the top two bays of a module is not supported.
Connecting cables
Connecting Fibre Channel cables
Figure 48. Connected modules
Installing 49

Table of Contents

Related product manuals