4-10
95-8533
18.2
Sequence of Events During a
Conguration Download
WARNING
The system is inactive and not executing
logic/alarm functions during a program
download (in both single and redundant
controller congurations).
When downloading a new configuration to the
master controller, the following sequence is
executed:
1. The S
³
software must be connected to the
master controller.
2. Alter the configuration and execute the
download command from S
³
.
3. The master controller goes into ‘Program’
mode and passes mastership to the
standby controller.
4. The updated configuration file is loaded into
the controller.
5. The controllers are automatically forced to
switch over.
6. The master controller puts the standby
controller into ‘Program’ mode and
downloads the configuration.
7. The controller indicates “Device Download
Active” until the LON devices have been
successfully updated.
8. The configuration download is now
complete.
Manual Switchover
The user can request a manual switchover
from an externally wired switch. The request
executes the following sequence:
1. Verify that HSSL communication is good and
there are no internal faults in the standby
controller.
2. Verify that the synchronization process is
complete.
3. The master requests the standby to take
control.
4. The standby takes control and becomes the
master.
5. The controller indicates “Device Download
Active” until the LON devices have been
successfully updated.
Automatic Switchover
An automatic transfer will be initiated if the
master controller goes into an error (self
detected internal controller failure, program
flow error in the controller, user logic checksum
error or application checksum error). An
automatic switchover executes the following
sequence:
1. Check that the standby controller is online
by verifying that HSSL communication is
good and there are no internal faults in the
standby controller.
2. Verify that the synchronization process is
complete.
3. The master requests the standby to take
control.
4. The standby takes control and becomes the
master.
Replacing a Faulty Controller
If the master controller fails and the standby
controller is healthy, an automatic switchover
will occur. To replace the failed controller,
perform the following steps:
1. Remove power. Disconnect plugs and
remove the failed controller.
2. Mount the new controller.
3. Connect the LON to the new controller.
4. Connect the HSSL.
5. Connect any other I/O used.
6. Apply power to the controller.
7. A controller synchronization occurs and the
new controller is configured and indicates
“Ready” as the standby controller.
8. If preferred, perform a manual switchover to
return the primary controller to the master
status.