Dobot M1 User Guide 6 Operation
Issue V1.3.4 (2019-05-23) User Guide Copyright © Yuejiang Technology Co., Ltd
111
NOTE
All signals Table 6.13 are falling edge triggered.
Select the corresponding IP address from the serial drop-down list on the upper
left pane of the M1Studio page and click Connect.
Click Tools > Web Management > Upload Offline Script to upload the script
to the main controller, as shown in Figure 6.60.
Figure 6.60 Upload script
Select the uploaded script on the Offline Script Management page and click
Offline to make the script in the offline status, as shown in Figure 6.61.
Figure 6.61 Script status
How to build a PLC project is not described in this topic.