EasyManua.ls Logo

DURKOPP ADLER 513 - Page 23

DURKOPP ADLER 513
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
Operating Instructions 513/533 - 01.0 - 09/2023 21
Inserting a full bobbin
To insert the full bobbin:
1. Insert the full bobbin into the bobbin case upper section (2).
2. Feed the hook thread through the bobbin case slot (7) under
the tensioning spring (5) into the hole (4).
3. Pull the hook thread approx. 2.5 cm out of the bobbin case (2).
The bobbin must rotate in the direction of the arrow when
pulling out the hook thread.
4. Insert the bobbin case (2).
5. Close the hook cover (3).

Table of Contents

Related product manuals