Maintenance - Maintenance schedule
4812164901_A.pdf 2022-11-14
General
Periodic maintenance should be carried out after the
number of hours specified. Use the daily, weekly etc.
periods where number of hours cannot be used.
Remove all dirt before filling, when checking
oils and fuel and when lubricating using oil
or grease.
Remove all dirt before filling, when checking
oils and fuel and when lubricating using oil
or grease.
Where both operational hours and time intervals
are specified, maintenance should be carried out
at the point in time that occurs first.
Where both operational hours and time intervals
are specified, maintenance should be carried out
at the point in time that occurs first.
Every 10 hours of operation (Daily)
Refer to the contents to find the page number of the
sections referred to !
Pos.
in fig
Action CommentPos.
in fig
Action Comment
Before starting up for the first time on that dayBefore starting up for the first time on that day
13 Check the hydraulic reservoir level13 Check the hydraulic reservoir level
1 Fill the water tanks1 Fill the water tanks
9 Check the sprinkler system9 Check the sprinkler system
4 Check for free circulation of cooling air4 Check for free circulation of cooling air
10 Check the scraper setting10 Check the scraper setting
Check the warning lampsCheck the warning lamps
3 Test the brakes3 Test the brakes
After the FIRST 50 hours of operation
Refer to the contents to find the page number of the
sections referred to !
Pos. Action CommentPos. Action Comment
12 Change the hydraulic fluid filter 12 Change the hydraulic fluid filter
Every 50 hours of operation (Weekly)
Refer to the contents to find the page number of the
sections referred to !
Pos. Action CommentPos. Action Comment
11 Check rubber elements and bolted joints11 Check rubber elements and bolted joints