AT600 User’s Manual 3
Chapter 2. Installation
Chapter 2. Installation
2.1 Introduction
To ensure safe and reliable operation of the AT600, the system must be installed in accordance with the established
guidelines. Those guidelines, explained in detail in this chapter, include the following topics:
• Unpacking the AT600 system
• Installing the electronics enclosure
• Installing the clamp-on fixture and transducer system
• Wiring the electronics enclosure
WARNING! The AT 600 flow transmitter can measure the flow rate of many fluids, some of which
are potentially hazardous. The importance of proper safety practices cannot be overemphasized.
Be sure to follow all applicable local safety codes and regulations for installing electrical equipment
and working with hazardous fluids or flow conditions. Consult company safety personnel or local
safety authorities to verify the safety of any procedure or practice.
ATTENTION EUROPEAN CUSTOMERS! To meet CE Mark and UL Mark requirements, all cables must
be installed as described in Appendix C, CE Mark Compliance.