EasyManua.ls Logo

GE Definium AMX 700 - Page 215

GE Definium AMX 700
240 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter A8: Quality Assurance Process and Maintenance
Definium AMX 700 X-Ray System 5161515-1EN Rev. 6 (10 February 2008) A8-4
Operator Manual © 2008 General Electric Company. All rights reserved.
Figure A8-4 Quality Assurance Program screen
3. Press [DETECTOR CHECK].
The Detector Check Tests screen appears.
Figure A8-5 Detector Check Tests screen
4. Press [START] to begin the Detector Check.
5. Wait for the test to complete.
The Detector Check result screen appears automatically after tests have been completed.
FOR TRAINING PURPOSES ONLY!
NOTE: Once downloaded, this document is UNCONTROLLED, and therefore may not be the latest revision. Always confirm revision status against a validated source (ie CDL).

Table of Contents

Related product manuals