Chapter A8: Quality Assurance Process and Maintenance
Definium AMX 700 X-Ray System 5161515-1EN Rev. 6 (10 February 2008) A8-5
Operator Manual © 2008 General Electric Company. All rights reserved.
Figure A8-6 Detector Check results screen
Failed Detector Check
If the system fails the Detector Check (Figure A8-7), call to schedule service. The system is operational,
although inspection and potential calibration are needed.
WARNING: Image quality may be degraded if you continue to use a detector that has failed the
Detector Check tests.
Figure A8-7 Failed Detector Check results
Perform QAP
QAP involves tests requiring exposures with the flat field phantom. The GE Portable DR Detector QAP kit
includes a flat-field phantom (Figure A8-8) sized to fit the collimator.
FOR TRAINING PURPOSES ONLY!
NOTE: Once downloaded, this document is UNCONTROLLED, and therefore may not be the latest revision. Always confirm revision status against a validated source (ie CDL).