GE
D
IRECTION 5750007-1EN, REVISION REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
Index - 2 -
Manpower Requirements 2-8
Mechanical
Safety 1-21
Mechanical Safety 1-21
Monitor Adjustments 6-2
N
Networking Pre-installation Requirements 2-13
O
Off-board Peripherals 3-36
On-board Peripherals 3-36, 5-27
Operating Temperature 2-2
Optional Peripherals/Peripheral Connection 3-36
Options (Software) Configuration 3-37
P
Packing Materials
Recycling Information 3-11
Peripherals 5-27
Checks 3-36
Connection 3-36
External Peripherals 3-36
Internal Peripherals 3-36
Physical
Dimensions 3-16
Inspection 3-12
Power Stability Requirements 2-5
Power Transients 2-5
Voltage Dop-out 2-5
Power Transients 2-5
Power-up Procedures
Voltage Settings 3-17
Pre-Installation 2-1
Requirements
DICOM 2-13
Preparing Unit for Installation 3-12
Probe
Disconnect Probe 3-20
Probes
Disconnecting 4-27
Environmental Requirements 2-8
Probes/Connector Usage
Functional Checks 4-17
Product Icons 1-10, 1-17
Purchaser Responsibilities 2-9
R
Receiving and Unpacking the Equipment 3-4
Recycling Information
Packing Materials 3-11
Reject
Optimizing 2D 4-19
Renewal Parts 9-1
Required Facility Needs 2-10
Returning/Shipping Probes and Repair Parts 8-5
S
Safety
Considerations 1-18
Precaution Messages 1-6
Screen Captures 7-10
Service Adjustments 6-1
Site
Circuit Breaker 2-5
Power Outlets 2-5
Requirements
Desirable Features 2-11
Software
Software Option Installation 3-37
Software Options Configuration 3-37
Software/Hardware Compatibility 9-4
Special Tools, Supplies and Equipment 10-8
Standard Hazard Icons 1-7
Storage temperature 2-2
System
Configuration 3-35
Manufacture 1-35
Overview 1-5
Systems Covered by this Manual 1-4
T
Theory 5-1
Time and Manpower Requirements 2-8
Top Console 5-20
Transporting the scanner 5-20
Trouble Image with Logs 7-4
Troubleshooting
Gathering Trouble Data 7-2
Screen Captures 7-10
Trouble Image with Logs 7-4
Vital System Information 7-3
U
Unpacking the Equipment 3-4
V
Voltage
Drop-out 2-5
Settings 3-17