5 PREVENTIVE MAINTENANCE
The amount of maintenance required depends largely on the
quality of the incoming water and how often the machine is used.
The maintenance interval will have to be determined in each
individual case. Getinge Disinfection AB recommends that the
stated maintenance operations be performed at intervals according
to the following table.
5.1 Periodic maintenance
WARNING!
Only to be carried out by authorized staff.
WARNING!
The machine is connected to the electricity
supply and some components are live.
Periodic maintenance and system testing is performed to ensure
safety and the machine's proper operation.
In addition to system testing, we recommend that appropriate
cleaning tests and temperature validation are performed according
to EN ISO 15883.
Document performed service measures in accordance with local
regulations.
5 PREVENTIVE MAINTENANCE
60 (128) TECHNICAL MANUAL GETINGE WD15 CLARO
<Doc_TEC><Doc_6001396902><Rev.I><Lang_en>

Table of Contents

Other manuals for Getinge GE15

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Getinge GE15 and is the answer not in the manual?

Getinge GE15 Specifications

General IconGeneral
BrandGetinge
ModelGE15
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals