Main switch OFF/ON
Input: Automatic
Output: Ready for operation
Input: 1
Input: 2
Input: 4
Input: 8
Input: 16
Input: 32
Input: 64
Input: --
Input: Machine ready
Input: Start
Output: No Leak
Output: Rework 1
Output: Leak
Output: Fault
Input: Leak simulation
Input: Static Test (Flooding) On
(Program number 7 is displayed)
The input “Start” should be a pulse with a length of approx. 1 seconds.
* Entry point after removing the dignal “Abort”. This signal deletes all outputs and interrupts the measuring
process at any point (only in automatic mode). The specimen is vented (e.g. for emergency stop).