EasyManua.ls Logo

Hi-Target HTS-420R - Page 74

Hi-Target HTS-420R
192 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Total Station Manual
- 73 -
3
A
The program searchs the
point name in the job and
show the result dialog.
The match points will be
listed, press [F4](OK) to
identify selected point
and back to Stakeout
screen. (If the input is
wildcard "*", the program
will show all the points of
the current job.)
2
B
If there is no match point
in the job, the program
promptsPt. not
found!.And then go in
Find Point In Job screen.
User can input a point or
select a point from
another job and then
back to Stakeout screen.
[Find Pt.] 1/20
5 Fix PT
View Coord. Job OK
B1 Meas. PT
B2 Meas. PT
B3 Meas. PT
B4 Meas. PT
A12
Job Zero Coord. Find
[Find Pt.]
Job :
Pt. :
DEFAULT
Select job or input coord.!
4 After finishing setting
stakeout point, start
staking out.
*
ALL DIST REC
[Stakeout] 1/3
Search :
Pt. :
T.H :
Hz :
:
:
5
1.500 m
-13°2960
-0.108 m
0.175 m
1
The settings of job, station and orientation have been elaborated in detailIn the
previous chapters, here is no longer repeat. Refer tochaptersSetting The Job
Setting The StationSetting The Orientation.
2
Unlike the other place's points list, the stakeout points are ordered by time.In
the stakeout points list, the newest point is at the back and the fix point is in the
front ofmeasured point. But in the other points list, the newest point is at the
back and the measured point is in the front offix point.

Table of Contents

Other manuals for Hi-Target HTS-420R

Related product manuals