EasyManua.ls Logo

jcb 19C-1E - Hydraulic Hitch Unlock Sequence

jcb 19C-1E
180 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Attachments
Quickhitch
Figure 79.
A
A Front pivot pin
Hydraulic Hitch Unlock Sequence
Standard Attachment
1. To start Quickhitch unlock process make sure that hydraulics are on then press the Quickhitch sequence
switch.
Figure 80.
2. Press the control isolation switch to confirm the process. Make sure that LED (Light Emitting Diode) on
the boom turns red.
Figure 81.
3. To disengage the pivot pin, crowd the attachment for the specified time then remove the attachment.
Duration: 3s
Figure 82.
4. Operate the machine to engage the jaw with the new attachment and then full crowd the attachment to
align latch.
93 9831/8250-4 93
JCB © Admin Pimteam - 23/06/2021 05:32.

Table of Contents

Other manuals for jcb 19C-1E

Related product manuals