Table 21: MX10003 Site Preparation Checklist (continued)
DatePerformed ByFor More InformationItem or Task
“Calculating Power Budget and Power Margin for Fiber-Optic Cables” on page 74Acquire cables and connectors:
•
Determine the number of cables needed
based on your planned configuration.
•
Review the maximum distance allowed
for each cable. Choose the length of cable
based on the distance between the
hardware components being connected.
RELATED DOCUMENTATION
MX10003 Installation Overview | 83
Tools Required to the Install MX10003 Router in a Rack | 88
Installing the MX10003 Router in a Rack | 89
MX10003 Site Guidelines and Requirements
IN THIS SECTION
MX10003 Router Environmental Specifications | 60
MX10003 Router Grounding Specifications | 61
MX10003 Router Clearance Requirements for Airflow and Hardware Maintenance | 63
MX10003 Router Physical Specifications | 64
MX10003 Router Rack Requirements | 66
MX10003 Router Cabinet Requirements and Specifications | 68
MX10003 Router Environmental Specifications
Table 22 on page 61 specifies the environmental specifications required for normal router operation. In
addition, the site should be as dust-free as possible.
60