394149/D
79
Caution
Beforeweldingcommences,makesurethattheroomisproperlyventilated.Always
wearthepersonalprotectiveequipment.Observeandobeytherelevantsafety
instructions.
AEarthstrap
BBolttheshockabsorbertothebulkhead.
CSecuretheshockabsorberassemblytothetopofthecabinet.
Cableentryisfoundatthetopand/orbottomofthecabinet.
Note
EnsuremaximumphysicaldistancebetweentheWideBandTransceiver(WBT)andthe
PowerSupplyUnit.Thisisimportanttoreducenoise.Placethepowersuppliesona
dedicateddraweratthebottomofthecabinet.
HowtoinstallthecablesintheWBTCabinetisdescribedondrawing444425.The
drawingcanbedownloadedfromourwebsite.Thedrawingisalsoincludedonthe
EK80USB.
Procedure
1Preparetheinstallationofthecabinet.
aObservetheoutlinedimensionsdrawing.
ThedrawingislocatedintheDrawinglechapterinthismanual.Itcanalso
bedownloadedfromourwebsite.
•https://www.kongsberg.com/simrad
InstallingtheEK80hardwareunits