,167$//$7,21 9HUVD3XOVH3RZHU6XLWH6HULHV6HUYLFH0DQXDO
5(9%
• The system will fire during the turn-on sequence regardless if SW3 (Autocal) on the CPU
PCB is left or right and the BRH plug is installed. Only those persons required should be
present during this portion of the installation - those present must wear appropriate laser
safety eyewear and follow all laser safety precautions.
• The cooling fan blades are not covered. The fan is located on top of the heat exchanger. It
operates whenever the system is turned on. Keep tools, system parts and body parts clear of
the fan blades.
1. Turn and hold the keyswitch to the START position, then after approximately two seconds, release it to
the ON position. The system will go through its start up sequence. Observe for normal start up, and
for any indication of leaks in the cooling system.
2. Add additional coolant if necessary.
NOTE: Only add water if disconnected from AC mains.
Turn system off and disconnect from the AC mains. Top off the fill reservoir. Reconnect to AC mains
and cycle the machine off and on several times, adding coolant as necessary until the fill reservoir
level stays up to approximately half full as the system runs.
3. Perform Fiber Alignment Test, Verify Calibration procedure and the Operational & Safety checks in
Section 3.
4. Replace all covers and prepare the system for demonstration to the customer.
2.1.6 Customer Demonstration
1. Demonstrate the system operation to the customer.
2. Fill out and mail the “self mailer” installation quality audit report (for U.S. Field Service).
3. Fill out the System Certification report.