EasyManua.ls Logo

Manitowoc 16000 - Page 142

Manitowoc 16000
230 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reference Only
SET-UP AND INSTALLATION 16000 OPERATOR MANUAL
4-4
Published 05-09-17, Control # 011-29_v2
FIGURE 4-1
4-1
Component Identification
Item Description
1Live Mast
2 Handling Pendant (Mast and Boom Butt)
3 Load Block — 45 USt (41 t)
4 4-Leg Chain Sling
5 Operator’s Cab
6 Crawler Assembly
7 Rotating Bed Adapter Frame
8 Carbody
9 Carbody Jacks
10 Carbody Counterweight (both ends)
11 Live Mast Assist Arm (1 each side)
12 Rotating Bed
13 Boom Hoist
14 Crane (Rotating Bed) Counterweight
15 Boom Hoist Wire Rope
1
(not shown)
10
5
13
4
6
7
11
12
14
15
2
3
(between counterweights)
9
9
8

Table of Contents

Other manuals for Manitowoc 16000

Related product manuals