RT9150E OPERATOR MANUAL SET-UP AND INSTALLATION
4
Grove
Published 2-23-2017, Control # 644-00
5. Disconnect the short end hoses (1) (Figure 4-79) from
the 26 ft (8 m) extension from the boom nose connectors
(2).
6. Install protective caps on the hose ends.
Folding the Deflection Sheave on the 26 ft (8 m)
Extension
NOTE: For folding and unfolding the deflection sheaves on
the 36 ft section refer to Folding Deflection
Sheaves, page 4-36.
Folding Out the Deflection Sheave
1. Remove the retaining clips from the pins (3)
(Figure 4-80).
2. Hold the deflection sheave by the handle (1) and pull out
the pins (3).
3. Fold the deflection sheave up by the handle (1) and
insert the pins (3).
4. Secure the pins using the retaining clips.
Folding In the Deflection Sheave
1. Remove the retaining clips from the pins (3)
(Figure 4-81).
2. Hold the deflection sheave by the handle (1) and pull out
the pins (3).
3. Fold the deflection sheave (2) downwards and fasten it
in this position with the pins (3).
4. Secure the pins (3) using retaining clips.
2
FIGURE 4-79
1
FIGURE 4-80
7567-61
2
1
3
3
FIGURE 4-81
7567-62
2
3
3
2
1