EasyManua.ls Logo

McLaughlin VX30 Series - Pintle Hitch - Inspect; Tank Full Shutdown Switch - Check; Vacuum and Water Hoses - Check

McLaughlin VX30 Series
210 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
VX30/VX50 Gen3/ECO50 Vacuum Systems Maintenance - 10 Service Hours or Daily 60-15
Pintle Hitch - Inspect
Inspect pintle hitch for cracks, damage, or wear. If wear exceeds 3/16"
(5 mm) from the original surface profile, replace pintle ring (1). Check
mounting bolts for signs of loosening or damage. Torque 3/4-10 x 2-1/2" Grade
5 bolts to 200 ft-lb (271 Nm). Contact your Vermeer dealer for approved parts.
Tank Full Shutdown Switch - Check
Ensure Tank Full Shutdown Switch shuts off the engine when spoil tank is full. If switch does not function
properly, contact a Vermeer dealer.
Vacuum and Water Hoses - Check
Check condition of the vacuum hoses and high pressure water hoses.
Replace sections of vacuum and water hoses as necessary.

Table of Contents

Related product manuals