ZS3 Service Manual Page 262 of 295
1. Reconnect the main AC power cord from the rear of the system or plug into the
wall source.
2. Place AC circuit breaker, located at the rear of the system, in the ā1ā (ON)
position.
3. Operate the lift mechanism through its full range to ensure proper gas spring
operation.
4. Power on the system and perform a series of basic user operations, to verify
normal system functionality.
5. Once verification is complete, return system to normal operation.