2-1
In This Section
This section provides the information you need to get the elevator running in Construction
Mode:
Machine Room Preparation (see page 2-3).
Controller Cabinet Installation (see page 2-5).
Equipment Grounding (see page 2-5).
Check for Shorts to Ground (see page 2-6).
AC Voltage Verification and Wiring (see page 2-7).
Motor and Brake Wiring (see page 2-9).
Velocity Encoder Installation (see page 2-10).
Safety String Wiring (see page 2-12).
Applying Power (see page 2-14).
Initial Parameter Settings (see page 2-16).
Drive Parameter Adjustments (see page 2-20).
Brake Calibration (see page 2-40).
Running on Machine Room Inspection (see page 2-44).
•Calibration Actual Car Speed (see page 2-49).
Construction Mode