2-1
In This Section
This section provides the information you need to get the elevator running in Construction
Mode:
• Machine Room Preparation (see page 2-3).
• Controller Cabinet Installation (see page 2-5).
• Equipment Grounding (see page 2-5).
• Check for Shorts to Ground (see page 2-6).
• AC Voltage Verification and Wiring (see page 2-7).
• Motor and Brake Wiring (see page 2-9).
• Velocity Encoder Installation (see page 2-10).
• Safety String Wiring (see page 2-12).
• Applying Power (see page 2-14).
• Initial Parameter Settings (see page 2-16).
• Drive Parameter Adjustments (see page 2-20).
• Brake Calibration (see page 2-40).
• Running on Machine Room Inspection (see page 2-44).
•Calibration Actual Car Speed (see page 2-49).
Construction Mode