Install a Power Supply
Related Information
■
“Power Supply LEDs” on page 69
Install a Power Supply
This is a hot-service procedure that can be performed by a customer while the server is running.
Caution - Always replace a faulty power supply with a power supply of the same type (model).
Caution - Replace the power supply within 5 minutes to ensure proper system cooling.
1.
Remove the replacement power supply from its packaging and place it on an
antistatic mat.
2.
Align the replacement power supply with the empty power supply slot (1).
3.
Slide the power supply into the bay until it is fully seated (2).
Ensure you press the power supply in firmly, then close the latch. You hear an audible click
when the power supply fully seats.
4.
Reconnect the power cord to the power supply.
5.
Verify that the amber LED on the replaced power supply and the Service
Required LEDs on the front and rear panels of the server are not lit.
72 SPARC S7-2 Server Service Manual • March 2017