EasyManua.ls Logo

Rapid 4044 - Page 15

Rapid 4044
162 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION 2: INSTALLER R ESPONSIBILITY
7 of 154
the air handler and accessories may be placed in a
safe manner.
The qualified installer or service technician is
responsible for having the appropriate equipment for
the safe installation and start-up of an industrial air
handler. Tools required to commission the equipment
include, but are not limited to, the following:
• Various screwdriver types and sizes
• Various adjustable wrenches
• Torque wrenches
• Pipe wrenches sized appropriately for the gas
train components
• Drill motor and various drill bits and runners
• U-tube manometer or gas pressure gauge
• Volt meter
• Clamp style ammeter
• Belt tension gauge
• Thermometer

Table of Contents

Related product manuals