Index
I–5
Publication 1336 IMPACT-6.8 – November, 2002
Thermostat
Installation, 5–29
Removal, 5–27
Testing, 4–16
Tools Required, 3–2
Torque
Four-Point Mounting Sequence, 3–4
Sequence, 3–3
Six-Point Mounting Sequence, 3–4
Specifications, 3–3
Two-Point Mounting Sequence, 3–3
Troubleshooting
Encoderless Mode, 2–22
HIM Display = Running, 2–18
Miscellaneous, 2–20
Motor Response, 2–19
No HIM Display, 2–17
No Start or Jog, 2–16
Start Up, 2–20
True, Definition, P–10
V
Volt-Sharing Resistor
Connection Diagram, 4–10, 5–41
Installation, 5–43
Removal, 5–42
Testing, 4–10
W
Warnings
Bus Cycle>5, 2–14
Bus Drop, 2–14
Bus Undervlt, 2–14
Control Board LEDs, 2–1
External Flt In, 2–9
Inv Overload, 2–6
Inv Overtemp Pnd, 2–6
InvOvld Pend, 2–6
mA Input, 2–8
Math Limit, 2–8
Mtr Stall, 2–5
MtrOvrld Pend, 2–4
MtrOvrld Trp, 2–5
Open Circuit, 2–15
Param Limit, 2–8
Prechrg Time, 2–14
Ridethru Time, 2–14
SP 1 Timeout, 2–10
SP 2 Timeout, 2–10
SP 3 Timeout, 2–11
SP 4 Timeout, 2–11
SP 5 Timeout, 2–11
SP 6 Timeout, 2–11
SP Error, 2–11
Spd Fdbk Loss, 2–9
Viewing Queue with HIM, 2–2
Z
Zener Diode, Test, 4–5