EasyManua.ls Logo

Skyjack SJ6826RT - Page 22

Skyjack SJ6826RT
177 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
SJ6826RT, SJ6832RT
213560ABA
Base/Engine Section 1 – Scheduled Maintenance
16
Main Power Disconnect Switch (B)
Turn main power disconnect switch to off
position.
Make sure the cables are secure and correctly
installed.
17
Base Controls (B)
Make sure the base controls are correctly
installed.
Make sure there is no visible damage.
AC power socket (B)
Make sure there is no visible damage.
18
Base Weldment (B)
There are no cracks in the welds or structure.
There are no signs of deformation.
19
Grease points(B)
Make sure there is no visible damage.
Make sure there is no dirt or blockages.
Add grease if necessary.
20
Ladder (B)
Make sure there are no loose or missing parts.
Make sure there is no visible damage.
17
18
20
16
19
To order go to Discount-Equipment.com

Table of Contents

Related product manuals