EasyManua.ls Logo

Stulz EC Tower ECD 91 - Page 97

Stulz EC Tower ECD 91
206 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
97 © STULZ GmbH – all rights reserved EN/01.2019/G22
ec tower technical manual

Flexible canvas fitting
Procedure
1. Switch off the air conditioning unit.
2. Fit suitable sealing tape on the contact surfaces
(1) on both sides of the flexible canvas fitting.
3. Install the adapter panel (see “13.6Installing the
adapter panel for Upflow units“ on page 94).
4. Fasten the flexible canvas fitting to the adapter
panel .
5. Connect the flexible canvas fitting to the air duct.
Installation
1
EC Tower
51-5670-16 ECTower_Vorlage.indd 1
03.08.16 16:31

Table of Contents

Related product manuals