EasyManua.ls Logo

Stulz EC Tower ECD 91 - 13.8 Installing the louver damper for Upflow units

Stulz EC Tower ECD 91
206 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
98 EN/01.2019/G22  © STULZ GmbH – all rights reserved
ec tower technical manual
Size 2:
13.8Installing the louver damper for Upflow units
In Upflow units, the louver damper is installed on the blow-out side. This illustration shows the louver damper

on the Upflow unit. The adapter panel is included in the louver damper product package.
The louver damper is available for sizes 1 and 2.
Size 1:
Dimensions


Table of Contents

Related product manuals