EasyManua.ls Logo

Suzuki AN400 - Page 44

Suzuki AN400
475 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
0B-17 Maintenance and Lubrication:
Chassis Bolt and Nut Inspection
B705H10206022
Tighten chassis bolt and nut
Initially at 1 000 km (600 miles, 2 month) and every 6
000 km (4 000 miles, 12 months) thereafter
Check that all chassis bolts and nuts are tightened to
their specified torque.
1. Handlebar holder clamp bolt
: 55 Nm (5.5 kgf-m, 40.0 lb-ft)
2. Handlebar holder set bolt : 23 Nm (2.3 kgf-m, 165 lb-ft)
3. Steering stem lock nut : 30 Nm (3.0 kgf-m, 21.5 lb-ft)
4. Handlebar clamp bolt
: 23 Nm (2.3 kgf-m, 16.5 lb-ft)
(a)
1
I705H1020057-03
(b)
2
(c)
3
I705H1020059-01
(d)
4
I705H1020058-06
5. Brake master cylinder mounting bolt
:10 Nm (1.0 kgf-m, 7.0 lb-ft)
6. Front fork clamp bolt : 23 Nm (2.3 kgf-m, 16.5 lb-ft)
7. Front fork cap bolt : 45 Nm (4.5 kgf-m, 32.5 lb-ft)
8. Front axle : 65 Nm (6.5 kgf-m, 47.0 lb-ft)
9. Front axle pinch bolt : 23 Nm (2.3 kgf-m, 16.5 lb-ft)
10. Front brake caliper mounting
bolt
:35 Nm (3.5 kgf-m, 25.5 lb-ft)
11. Brake caliper air bleeder valve
(Front & Rear)
:6.0 Nm (0.6 kgf-m, 4.5 lb-ft)
13. Brake disc bolt (Front & Rear) : 23 Nm (2.3 kgf-m, 16.5 lb-ft)
(e)
5
I705H1020061-01
(g)
7
(f)
6
I705H1020060-01
(h)
8
(i)
9
(j)
10
(m)
13
(m)
13
(k)
11
I705H1020062-03

Table of Contents

Other manuals for Suzuki AN400

Related product manuals