EasyManua.ls Logo

Suzuki GSF650A - HO2 Sensor Inspection; HO2 Sensor Removal and Installation; GP Switch Inspection; GP Switch Removal and Installation

Suzuki GSF650A
697 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1C-6 Engine Electrical Devices:
4) Click the “ISC learned value reset” (1).
5) Click the “Reset” button to clear the ISC leaned
value.
NOTE
The leaned value of the ISC valve is set at
PRESET position.
6) Close the SDS tool and turn the ignition to OFF
position.
NOTE
The ISC valve opening initialization is
automatically started after the ignition switch
is turned OFF position.
HO2 Sensor Inspection
B817H21306020
Refer to “DTC “C44” (P0130/P0135): HO2 Sensor
(HO2S) Circuit Malfunction in Section 1A (Page 1A-
104)”.
HO2 Sensor Removal and Installation
B817H21306021
Refer to “Heated Oxygen Sensor (HO2S) Removal and
Installation in Section 1B (Page 1B-5)”.
GP Switch Inspection
B817H21306022
Refer to “DTC “C31” (P0705): GP Switch Circuit
Malfunction in Section 1A (Page 1A-87)”.
GP Switch Removal and Installation
B817H21306023
Refer to “Gear Position Switch Removal and Installation
in Section 5B (Page 5B-12)”.
1
I718H1130018-01
2
Yes No
I718H1130023-02
I718H1130019-01

Table of Contents

Related product manuals