Manual Transmission: 5B-13
5) Remove the gear position switch (2).
Installation
Install the gear position switch in the reverse order of
removal. Pay attention to the following points:
• Apply grease to the O-ring.
CAUTION
!
Replace the O-ring with a new one.
NOTE
Align the gear position switch pin “A” with
the gearshift cam hole “B”.
: Grease 99000–25010 (SUZUKI SUPER
GREASE A or equivalent)
• Apply thread lock to the gear position switch bolts and
tighten them to the specified torque.
: Thread lock cement 99000–32110
(THREAD LOCK CEMENT SUPER 1322 or
equivalent)
Tightening torque
GP switch mounting bolt (a): 6.5 N·m (0.65 kgf-m,
4.7 lbf-ft)
• Route the gear position switch lead wire. Refer to
“Wiring Harness Routing Diagram (GSF650/S/A/
SAK7) in Section 9A (Page 9A-8)”.
Gearshift lever Construction
B817H25206009
2
I718H1520043-01
“A”
“B”
I718H1520044-01
1. Gearshift lever “a”: 45 – 55 mm (1.8 – 2.2 in)
2. Gearshift link arm : 40 N⋅m (4.0 kgf-m, 29.0 lb-ft)
3. Gearshift link rod : 23 N⋅m (2.3 kgf-m, 16.5 lb-ft)
“A”: Footrest top surface : Apply grease.
(a)
I718H1520045-02
1
2
3
“a”
“A”
(a)
(b)
I718H1520074-02