EasyManua.ls Logo

Suzuki GSF650A - Water Hose Routing Diagram

Suzuki GSF650A
697 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Engine Cooling System: 1F-3
Water Hose Routing Diagram
B817H21602002
“C”
“O”
“Q”
“S
“U
“T”
“P”
“R”
“F”
“C”
“D”
“D”
1
2
“G”
“J
6
6
5
“N
“B”
“a”
90 90
90
“A”
“C”
“D”
“L
“K”
“H”
“I”
“C”
“C”
“E
“D”
“D”
“F”
“J
“M
“F”
7
4
“D”
“M
3
7
/
“V”
I717H1160002-02
1. Jiggle valve “I”: The clamp screw head should face left backward.
2. Thermostat “J”: The clamp screw head should face upward.
3. Reservoir tank K”: The clamp screw head should face left upward.
4. Radiator heat shield “L”: The clamp screw head should face right side.
5. Radiator cover molding (GSF650 only) “M”: The clamp screw head should face left side.
6. Tape (GSF650 only) “N”: The clamp screw head should face forward.
7: Radiator outlet hose
: Check that there is at least 20 mm (0.8 in) of clearance between the
radiator outlet hose and the exhaust pipe.
“O”: Clamp the hose on yellow marking with the tail lamp harness.
“A”: Match mark “P”: Clamp the hose on white marking.
“B”: Marking position “Q”: Pass through the hose under the wiring harness.
“C”: White marking “R”: Pass through the hose under the seat lock plate.
“D”: Yellow marking “S”: Be careful not to pinch the hose between seat cushion and fender.
“E”: Red marking “T”: Pass through the hose between frame and reservoir tank. Be careful for
the hose not to be slackened.
“F”: The end of the clamp should face upward. “U”: Pass through the hose under the helmet holder.
“G”: The end of the clamp should face left side. “V”: Clamp the hose with the fan motor lead wire. Be careful not to insert the
coupler to the radiator heat shield hole.
“H”: The clamp screw head should face right backward. “a”: Clearance

Table of Contents

Related product manuals