EasyManua.ls Logo

Suzuki GSX1300R - Page 306

Suzuki GSX1300R
663 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1D-85 Engine Mechanical:
Install the gear position switch.
Install the gear position switch lead wire clamps.
Apply a bond lightly to the groove of gear position
switch lead wire grommet.
: Sealant 99000–31140 (SUZUKI BOND
No.1207B or equivalent)
NOTE
The flat surface of the clamp faces the lead
wire.
After contacting the clamp to the stopper
“C” of the crankcase, tighten the clamp
bolt.
Be sure to install the grommet (1) to the
crankcase.
Tightening torque
GP switch mounting bolt (a): 6.5 N·m (0.65 kgf-m,
4.7 lb-ft)
GP switch lead wire clamp bolt (b): 6.5 N·m (0.65
kgf-m, 4.7 lb-ft)
Oil Pump
Install the new O-ring to the oil pump and apply
grease to it.
CAUTION
!
Use the new O-ring to prevent oil leakage.
: Grease 99000–25010 (SUZUKI SUPER
GREASE A or equivalent)
NOTE
Set the oil pump shaft end “A” to the water
pump shaft.
Install the oil pump and tighten the bolts to the
specified torque.
Tightening torque
Oil pump mounting bolt (a): 10 N·m (1.0 kgf-m,
7.0 lb-ft)
“C”
1
I815H1140124-01
(b)
(a)
I823H1140255-02
“A”
I823H1140256-01
(a)
I823H1140257-02

Table of Contents

Other manuals for Suzuki GSX1300R

Related product manuals