3. view system log information (Show log button),
4. terminate the Live view session (Terminate button),
5. enable the SV 200A actuator and perform the instrument’s check (Enable Actuator button).
After enabling the actuator, the instrument starts measuring of the signal, generated by the actuator at
the level of 94 dB. If Read step is equal to 1s then it is possible to observe the measured actuator level.
9.7 CHANGING THE WORKING DIRECTORY
Working directory is a folder on the SD-card in which all the measurement files are stored.
Changing the working directory can be done with the SVAN Files feature of the SvanPC++ software
either via SV 200 Instrument wizard or via Remote Communication Center.
1. Make sure a measurement is not in progress.
2. Open the SVAN Files window and navigate to the desired directory using the left panel. The left
panel displays contents of the instrument’s memory. Create a new directory if necessary.