EasyManua.ls Logo

Universal Robots UR30 - Commissioning

Universal Robots UR30
238 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17.3. Commissioning
Descri
ption
The following tests must be conducted before using the robot application for the first time or after
making any modifications.
Verify all safety inputs and outputs are correctly connected.
Test all connected safety input and output, including devices common to multiple
machines or robots, are functioning as intended.
Test emergency stop buttons and inputs to verify the robot stops and the brakes engage.
Test safeguard inputs to verify the robot motion stops. If safeguard reset is configured,
check that it functions as intended.
Look at the initialization screen, activate the reduced input and verify the screen changes.
Change the operational mode to verify the mode icon changes in top right corner of
PolyScope screen.
Test the 3-position enabling device to verify that pressing to the center on position enables
motion in manual mode at a reduced speed.
If the Emergency Stop outputs are used, press the Emergency Stop push-button and
verify that there is a stop of the whole system.
Test the system connected to Robot Moving output, Robot Not Stopping output, Reduced
Mode output, or Not Reduced Mode output to verify the output changes are detected.
Determine the commissioning requirements of your robot application.
User Manual 214 UR30
17.Risk Assessment
Copyright © 2009–2024 by UniversalRobotsA/S. All rights reserved.

Table of Contents

Related product manuals