Page: 1-30
WALKER MANUFACTURING COMPANY
July 2006
SERVICE INSTRUCTIONS
SB36 Snowblower
Model MS, MC, MD, MT, MTL, MTEFI
1. Remove the mower deck from the tractor if neces-
sary. Refer to the appropriate Tractor Ownerās
Manual.
2. Attach each of the lift brackets to the predrilled holes
on the front chassis cross bar with a 5/16-18 x 1 in.
bolt and a Whiz locknut. The locknuts should be
on the front sides of the lift brackets. Refer to
Lift Bracket Installation illustration. The RH
bracket is attached using the existing battery pan
mount bolt on newer models. On earlier models,
obtain the 5/16-18 x 1 in. bolt and nut locally to
attach the RH bracket.
NOTE: Predrilled holes exist only on Walker
tractors built after 1984. For earlier models, drill two
5/16 in. (8 mm) holes in the front chassis cross bar
at the positions indicated in the Lift Bracket
Installation illustration.
IMPORTANT: For all 1980 to 1984 tractors,
remove the battery before drilling the RH hole.
Reinstall the battery after the lift brackets have been
installed. Refer to Battery Installation in Battery
Service in this section for battery installation
procedures.
5 in.
(127 mm)
5 in.
(127 mm)
3/4 in. (19 mm)
Tractor Front
Chassis Cross Bar
Drill Two 5/16 in.
(8 mm) Holes
Whiz Locknut Lift Bracket
5/16-18 x 1 in. Bolt
On Newer Models, Use Battery Pan
Mounting Bolt to Attach RH Bracket
Lift Bracket Installation