Start-up preparation checklist
5-15CenterMax Operating Instructions61211-1020202
Start-up preparation checklist
Housing covers
– Are all CMM housing covers mounted?
Power supply
– Is the power supply connected?
– Are the cables in perfect condition?
Compressed-air supply
– Is the compressed-air supply connected?
– Does the compressed-air supply have sufficient pressure?
– Is the required pressure indicated?
Probe rack (optional)
– Have all requirements regarding the probe rack been met?
– Has the probe rack been installed correctly?
– Is probe change possible without collision?