7-14
Measuring operation
61211-1020202 CenterMax Operating Instructions
Preparations for a measuring run
Prerequisites for a perfect measuring run
The following preparations have to be made to ensure maximum
accuracy of the CMM.
• Switch on the CMM at least 15 minutes before starting the mea-
suring run.
The CMM must be adapted to room temperature prior to the mea-
suring run.
• Always carry out a reference measurement after the reference
point travel and calibrate each probe used for measurement.
• Carry our temperature compensation ➤ page 7-22.
Reference point travel
Reference point
The reference point or origin is located in the upper right-hand corner
of the measuring volume. It must be determined by a reference point
travel prior to the measuring run ➤“Carrying out a reference point
travel” on page 7-16.
NOTE