Start-up checklist
6-19CenterMax Operating Instructions61211-1020202
Start-up checklist
Clamping the workpiece
Is the workpiece in the correct position? page 6-3.
Is it possible to measure all workpiece dimensions in one cycle?
Is measurement possible without collision? E.g. collision with the
probe rack.
Is the workpiece clamped? page 6-3.
Switching on the CMM
Has the CMM been switched on in the correct order? page 6-5.
Is the power supply connected?
Control cabinet switched on?
Drives switched on?
Operating mode selected?
Computer switched on?
Measuring software started?
Protective circuit for the driving forces
Has the protective circuit been checked? page 6-8.
Probe assembly
Have the criteria for probe assembly been observed? page 6-13.
Have the limiting values for the probe been observed?
page 6-14.