Switching the CMM on
6-5CenterMax Operating Instructions61211-1020202
Switching the CMM on
Safety measures
Danger!
A visual check must be carried out before switching the CMM on. The
CMM may be switched on only if it is in perfect condition.
• Make sure that the CMM is in perfect condition ➤“Visual check”
on page 5-14.
Switch-on sequence
Proceed as follows when switching the control on:
1 Connect power supply; switch power supply on by means of the
main switch
2 Switch the control on.
3 Switch the drives on.
4 Select the operating mode
5 Switch the computer on and start the measuring software.
!