6 SYSTEM UNCRATING & INSTALLATION PROCEDURES – UPDATE ENTIRE SECTION
Product Shipment
Shipping containers should be inspected for damages, and the “Tip-n-Tell” indicator for signs of mishandling
during shipment. If any problems are found, make notes of any discrepancies and immediately report to the
shipping carrier and to ZONARE’s shipping department representative.
All installation and set-up of equipment should be done following this official ZONARE product installation
procedure.
Electrical Requirements
Medical Grade Receptacles grounded (3-Prong) 110-120 VAC, 15 amp, 60Hz. wall outlets (or proper 220-240
VAC outlets for systems configured for these power requirements) are required for the z.one
pro
ultrasound
system.
Environmental and Space Requirements
The z.one
pro
ultrasound system may be located anywhere within the facility, as long as there is appropriate
power outlets and appropriate network connectivity (at facilities utilizing a DICOM device hook-up).
Uncrating
1. Prior to opening any packaging, inspect the “Tip-n-Tell” indicator (attached to the outside of the main
shipping box) for signs that the system has been subjected to shock or tilt conditions during shipment.
2. Also inspect the shipping container for any visual signs of rough handling or abuse during shipment.
3. If any discrepancies from shipment are noted, follow the instructions listed in the “Product Shipment”
section above.
4. Remove all banding straps surrounding the cardboard main shipping container.
5. Lift off the top cover portion of the main cardboard shipping container, and set aside.
6. Remove the small boxes (containing the transducers) from the inner storage box area (resting atop the
z.one
pro
System).
7. Lift the inner storage box upwards, and remove it from the main shipping container.
8. Grasping the sides, slide the cardboard main shipping box upwards, exposing the z.one
pro
system.
Continue lifting until the cardboard box can be completely removed, and set aside.